Greenwall Shelter 1st

The Green Mountain National Forest was established in 1932 on land that had been heavily logged, farmed, and then abandoned — terrain that private owners had left in a depleted state that made it available for federal acquisition at low cost. By the mid-1930s the Forest Service was actively developing the national forest’s infrastructure, both to provide public recreation and to fulfill the conservation mandate of the New Deal era. The Civilian Conservation Corps, operating under Army supervision on Forest Service land across Vermont, built trails, shelters, bridges, and fire lookouts throughout the decade, and Company 133 of the CCC, based at Weston and East Wallingford, worked specifically in the Wallingford area during this period.

The first Greenwall Shelter, built in 1937, reflects this era of federal investment in the Long Trail’s support infrastructure. Log construction was the dominant technique for Forest Service shelters in this period — robust, locally sourced, labor-intensive — and the log structure with bunks for six to eight persons was a standard form for AT and Long Trail shelters on GMNF land. The shelter was built on land the Forest Service administered, constructed by Forest Service personnel or resources, and listed in the Long Trail Guide Book from 1937 onward as a recognized overnight facility on the trail system. Its appearance in the first post-New Deal edition of the guide (the eleventh, 1937) captures the moment when federal investment in the trail’s physical infrastructure first became tangible in published form on this section.

Life of the Shelter: 1937 to 1960

The shelter appeared in consecutive editions of the Long Trail Guide Book across twenty-three years of active listing: the eleventh edition (1937, p. 23), the twelfth edition (1940, p. 24), the thirteenth edition (1947, p. 23), and the sixteenth, fiftieth-anniversary edition (1960, p. 30). Its presence through the war years and into the postwar decades of renewed trail use reflects the durability of the original log construction, even as the Green Mountain Club’s own shelter network expanded and modernized elsewhere on the trail.

A photograph taken in 1941, four years after construction, shows the shelter in what appears to be solid condition: the image gives the clearest surviving picture of the structure’s form and setting. By 1956, however, the situation had begun to draw attention. A notice in Smoke and Blazes, the newsletter of the Killington Section of the GMC — the section responsible for maintaining this stretch of the Long Trail — records that section members organized hikes specifically to check on the shelter’s condition. That kind of organized monitoring, documented in a club newsletter, typically signals that a structure is nearing the end of its natural service life: a log shelter built in 1937 would have been nearly twenty years old by 1956, and the combination of weather, use, and the inherent limitations of unhewn log construction in a wet Vermont forest environment would have been accumulating over that span.

The Killington Section and Trail Stewardship

The Killington Section of the Green Mountain Club held responsibility for the Wallingford section of the Long Trail during the period of the first Greenwall Shelter’s use. Section members hiked the trail, performed maintenance, and documented conditions in their periodic publications. The 1956 reference in Smoke and Blazes to condition hikes at the Greenwall Shelter is a specific, dated instance of the kind of ongoing stewardship relationship that characterized the GMC’s management of the trail through its various sections — a partnership in which club volunteers on the ground provided the monitoring and smaller-scale maintenance that the Forest Service, as landowner, could not always supply for every individual shelter.

This relationship between the Forest Service as builder and landowner and the GMC as trail maintainer and steward was institutionalized in the Wallingford section by the 1930s and continues in modified form to the present day. The current USFS White Rocks Cliffs Trail page describes the area’s operation as a "Forest Service in partnership with the Green Mountain Club" arrangement — the contemporary expression of a relationship that was already operative when the first Greenwall Shelter was standing.

Successor Shelter and Disappearance from the Record

The Forest Service erected the second Greenwall Shelter in 1962, a framed lean-to with floor space for eight persons, located just north of the White Rocks National Recreation Area boundary. The spur trail to the spring — 600 feet in the same direction as at the first shelter — suggests the new structure was built in close proximity to or on the same site as the original log building. The transition from log to framed construction reflected the Forest Service’s shift in shelter design during the postwar period: framed lean-tos were faster to build, easier to maintain, and more resistant to some of the failure modes of log construction, particularly the rot that accumulated in log sills and lower timbers in wet mountain forest environments.

The first Greenwall Shelter disappears from the guide book record after 1960. Whether the log structure stood long enough to see the second shelter built alongside it, or whether it had already been demolished or collapsed before 1962, is not recorded in available sources. The second shelter has been in continuous use from 1962 to the present, carrying the name and the basic function — a stopping point on the Long Trail south of Wallingford Gulf, a spring trail 600 feet away — established by the first.

Sources

  • Smoke and Blazes (Killington) 09 (1956). Killington Section, Green Mountain Club. 4.
  • Long Trail Guide Book. 50th Anniversary Edition (16th) ed. Green Mountain Club, 1960.
  • Green Mountain Club. Long Trail Guide Book. 11 ed. Green Mountain Club, 1937. Pp. 23.
  • Green Mountain Club. Long Trail Guide Book. 12 ed. Green Mountain Club, 1940. Pp. 24.
  • Green Mountain Club. Long Trail Guide Book. 13 ed. Green Mountain Club, 1947. Pp. 23.
  • Green Mountain Club. Guide Book of the Long Trail. 16 ed. Green Mountain Club, 1960. Pp. 30.